Two suppliers quote the same part at 0.42 and 0.71 per piece. Both are telling the truth. One has a 16-cavity tool running a two-second cycle, the other has an 8-cavity tool with a hot runner problem, and the quote reflects that. Understanding how a molded part price is constructed is what turns a quote into a negotiation and a design decision.

Figure 1. Injection Molded Part Cost Estimation: A Guide.
This guide breaks the price into its components, gives the formulas, and shows where design changes actually move the number.
A molded part price has six components. Four are recurring per-part costs, two are one-time.
| Component | Type | Typical share of price |
|---|---|---|
| Material (part + runner scrap) | Per part | 40–65% |
| Machine time (cycle × hourly rate ÷ cavitation) | Per part | 15–35% |
| Labor (inspection, degating, packing) | Per part | 3–10% |
| Scrap / reject allowance | Per part | 2–8% |
| Tooling amortization | One-time or per part | Depends on volume |
| Secondary operations (decorating, assembly, testing) | Per part | 0–20% |
The first thing to notice: material dominates. Any design change that adds 1 g to the part adds far more to the price than a process improvement that shaves 0.2 s off the cycle. This is why wall thickness and part weight are the highest-leverage cost levers in the whole design.
`` Material cost per part = part weight × material price per kg + runner weight × material price per kg × (1 − regrind credit) ``
Practical points:
`` Machine cost per part = cycle time (s) × machine hourly rate ÷ 3600 ÷ cavitation ``
The two inputs that matter:
Cycle time is the sum of injection, hold, cooling and mold-open time. Cooling usually dominates:
Machine hourly rate scales with clamp tonnage. A 1,500-ton machine may cost four to six times a 150-ton machine per hour. So the part design that needs a smaller machine is a cheaper part — clamp tonnage is driven by projected area, and thin walls with high injection pressure push it up.
Cavitation divides the machine cost. Doubling cavities halves the machine cost per part, provided the cycle time and the machine size do not rise. High-cavity tools pay off when the annual volume justifies the tool cost.
Apply a reject allowance based on realistic yield for the process: 1–3% for a mature well-designed part, 5–10% for a tight-tolerance or cosmetic-critical part, higher during ramp-up. Design details that quietly raise the reject rate:
Tool cost is mostly a function of cavitation, size, surface finish and mechanism complexity:
| Cost driver | Low | High |
|---|---|---|
| Cavitation | 1–2 | 32–64 |
| Part size | Small | Large, multi-plate |
| Surface finish | Standard | Class A, high gloss, texture |
| Mechanisms | None | Slides, lifters, unscrewing |
| Steel | P20 | Hardened S136, H13 |
| Hot runner | Cold runner | Full valve gate |
Amortize across the expected production volume, and check the breakeven when comparing a slow cheap tool against a fast expensive one:
`` Breakeven quantity = (tool cost B − tool cost A) ÷ (part cost A − part cost B) ``
If the answer is below the expected lifetime volume, the more expensive tool is the cheaper choice — and this is a calculation a supplier can be asked to show.
A PP enclosure lid, 45 g part, 20 g runner, 2.0 mm nominal wall, 200,000 parts per year, 3-year life.
| Item | Basis | Cost per part |
|---|---|---|
| Material | 45 g × 1.30 /kg | 0.0585 |
| Runner scrap | 20 g × 1.30 × 40% net | 0.0104 |
| Machine | 28 s cycle, 250 t at 45/h, 8 cavities | 0.0438 |
| Labor + packing | 4 operators, output based | 0.0120 |
| Scrap allowance | 2.5% of above | 0.0031 |
| Recurring cost | ≈ 0.128 | |
| Tooling | 42,000 amortized over 600,000 | 0.0700 |
| Quoted unit price | before margin and freight | ≈ 0.198 |
Now change one thing: reduce the nominal wall from 2.0 to 1.6 mm.
That is the shape of the leverage in plastic part costing: weight and wall thickness move the price, everything else trims it.
Cost estimation is not an accounting exercise performed after the design; it is a design review tool. The design freeze is the moment when the price is fixed — the process can only protect it, not change it.