+86 159 1535 7170  ·  help@bao-laihua.com
★ ISO 9001:2015★ IATF 16949★ ISO 13485 workflow★ AS9100 aerospace workflow
Get a Quote
Request a quote

Send your drawings. Get a DFM review and quote within one business day.

A manufacturing engineer reviews every RFQ before pricing. Tell us the process, material and volume, and we will confirm feasibility, tooling approach, lead time and cost.

ISO 9001:2015 IATF 16949 ISO 13485 workflow AS9100 aerospace workflow 30+ years of team manufacturing experience NDA on request
Talk to an engineer

Direct line to the team that will build your parts

No call centre, no reseller. Your enquiry goes to our engineering and program management team in Shenzhen.

Registered officeMaling Community, Maqueling Industrial Zone, Yuehai Subdistrict, Nanshan District, Shenzhen, Guangdong, China
Manufacturing baseGonghe Industrial Zone, Bao'an District, Shenzhen, Guangdong, China

What to include

The more you send, the more accurate the first quote.

  • 3D CAD (STEP, IGES, X_T, STL) or 2D drawings (PDF, DWG)
  • Process preference: injection molding, CNC, sheet metal or casting
  • Material and surface finish, if already specified
  • Annual or first-order quantity, plus target delivery date
  • Any quality requirement: PPAP, FAI, first article report, cleanroom

Files can be sent by email up to 25 MB per message. For larger data, share a download link. We can sign an NDA before receiving your drawings.

Request a quote

Submit the form below. Include a secure CAD link if your files are large, and an engineer will review the project before pricing.

Chat on WhatsApp

By submitting you agree to be contacted about this enquiry. We do not share drawings or project data with third parties.

What happens next

From enquiry to T0 in four steps

STEP 01
Engineering review

We check geometry, material, draft, wall thickness and tooling feasibility against your volume.

STEP 02
DFM + quotation

You receive a written DFM note, tooling approach, unit price and lead time within one business day.

STEP 03
T0 samples

Soft tooling samples in 3–5 days; production steel tooling typically 4–6 weeks with FAI report.

STEP 04
Mass production

IATF 16949 controlled runs with in-process inspection, SPC and full material traceability.

Before you send

Common questions

How fast will I get a quote?

Most RFQs are answered within one business day. Complex multi-part assemblies or tooling programmes may take two days while we confirm mold layout and cycle time.

Do you sign an NDA?

Yes. Tell us before you send files and we will issue a mutual NDA. Drawings are stored on restricted internal systems and are not shared with third parties.

Can you work from samples instead of CAD?

Yes. We can reverse-engineer a sample, but for molded parts a 3D model is strongly preferred because it removes ambiguity in draft, shrinkage and parting line.

What is the minimum order quantity?

There is no fixed MOQ. Prototype quantities from 50 pieces are supported; tooling cost is quoted separately from part price.