Typical Price Ranges in 2026
Every mold is quoted from the part drawing, but after 1,000+ molds we see consistent bands. Prototype / soft tooling (aluminum or mild steel, single cavity, 5k-50k shots) typically runs USD 1,500-8,000. Single-cavity production tooling in P20 or 718H steel (100k-300k shots) usually lands between USD 3,000-12,000. Multi-cavity hardened production molds (S136/H13, 500k-1M+ shots, hot runner) range from USD 8,000 to 50,000+, and large automotive or two-shot molds can exceed that. These are budgetary ranges - part size and complexity move them more than any other factor.
The 8 Factors That Drive Your Quote
- Part size and press tonnage - bigger parts need bigger molds and bigger machines (we run 50T-3000T).
- Cavitation - more cavities raise tooling cost but cut unit price; the break-even point is a volume question.
- Steel grade and mold life - aluminum for prototypes, P20 for medium volumes, hardened S136/H13 for 500k+ shots or abrasive glass-filled resins.
- Geometry complexity - undercuts, side actions, lifters and unscrewing mechanisms add machining hours fast.
- Surface finish - mirror polish (SPI A1), texture (VDI/Mold-Tech) and engraving all add cost.
- Tolerances - +/-0.05 mm is standard; tighter datums mean slower machining and more fitting time.
- Runner system - cold runner is cheaper; hot runner adds USD 3k-15k but eliminates runner waste at volume.
- Material behavior - glass-filled, flame-retardant or high-temperature resins wear tooling and demand better steel and venting.
Tooling Cost vs. Unit Cost: Do the Math
A USD 6,000 two-cavity mold amortized over 10,000 parts adds USD 0.60 per part; over 200,000 parts it adds USD 0.03. This is why the right question is not "what does the mold cost" but "what does the mold cost per part at my volume". Prototype tooling makes sense below ~5,000 parts; multi-cavity hardened tooling earns its premium above ~100,000.
How to Reduce Tooling Spend
- Invest in DFM before cutting steel - a wall-thickness fix at CAD stage costs nothing; the same fix at T1 costs weeks and thousands of dollars.
- Simplify undercuts and consolidate parts where function allows.
- Use standard mold bases and off-the-shelf components (we stock EU/US standard ejector pins in-house).
- Start with a single-cavity "bridge" tool and scale to multi-cavity once the design is frozen.
- Ask for mold-flow analysis to be included - it is the cheapest insurance against warp, sink and short shots.
What a BAOLAIHUA Tooling Quote Includes
Every quotation comes with a DFM report within one business day, mold-flow analysis on request, T0 samples (rapid tooling in about 3 weeks, production tooling 4-6 weeks), FAI dimensional reports, and weekly photo/video progress reporting from a dedicated program manager.
Have a drawing ready? Send your STEP, IGES, X_T, STL or PDF files to help@bao-laihua.com or use our online RFQ form. A manufacturing engineer reviews every project and returns a DFM report with a quotation within one business day.