Thin-Wall form
Stepped cylindrical walls, internal clearance and mounting features must fill reliably without creating sink or ejection distortion.
A production-ready housing route for optical modules, camera bodies and compact electronic devices. The die layout, datum strategy and cosmetic finish are developed from the actual housing geometry.
The geometry shown on this page is used to illustrate a representative custom manufacturing route. Final design, alloy and inspection requirements are confirmed from the customer drawing.
Stepped cylindrical walls, internal clearance and mounting features must fill reliably without creating sink or ejection distortion.
Seat faces, bore alignment, sealing lands and cosmetic surfaces are identified before tooling so machining and inspection follow the same datum scheme.
Deburring, polishing, blasting, anodizing or painting can be specified against an approved appearance sample.
Each part is custom tooled and quoted from its drawing, annual volume and finishing route. The checklist below is used to align DFM, tooling and quality control.
| Item | Planning scope |
|---|---|
| Typical alloys | ADC12, A380 or A360; final grade confirmed against strength, corrosion and finish requirements |
| Die features | Core pulls, balanced gating, overflow, cooling and controlled ejection for cylindrical geometry |
| Draft | Typical external 0.5°–1.5° and internal 1°–2° at normal depths; increased where required by ribs, cores or texture |
| Machining | Datum faces, bore alignment, sealing seats and threaded or assembly features |
| Finishing | Trim and deburr, polish, bead blast, anodize, paint or assembly |
| Inspection | FAI and CMM dimensions, visual/cosmetic review, porosity checks and leak testing when specified |
Review walls, draft, optical faces, sealing areas and tolerance strategy.
Confirm gating, overflow, cooling, core pull and ejection.
Measure T1, review cosmetics and correct die features.
Remove gates, machine datums, polish and apply the approved finish.
Provide the 3D model, 2D drawing, alloy, annual volume, finish and inspection requirements. We will define the tooling and post-cast route around the component.