One team owns tool design, molding, finishing and PPAP. Tooling decisions are made against part cost, cycle time and annual volume — not in isolation.
Gate, runner, cooling, ejection and draft reviewed before steel is cut, backed by mold-flow simulation and tolerance stack-up.
P20, H13 and S136 tooling with hardened inserts, balanced cooling and a service life matched to your program.
Up to 64 cavities with hot-runner or cold-runner systems, balanced feed and cycle-time optimization for high volume.
TPE and TPU bonding to engineering plastics, plus metal inserts, connectors, handles and sealed interfaces.
Rotary-platen two-shot molding, multi-material parts and in-mold film decoration for appearance components.
T0 samples in 3–5 days, T1 in 5–7 days, with dimensional reports, FAI and PPAP documentation for approval.
36 materials available including commodity plastics, engineering resins, high-performance polymers, elastomers, and specialty compounds — 24 of them with full datasheets on our materials page.
Molded tolerances are measured at 23 °C, 24 hours after molding, on features up to 100 mm. Larger features and tighter callouts are quoted per drawing — send your GD&T and we confirm feasibility before any steel is cut.